Name: _________________________ | Period: ___________________ |
This quiz consists of 5 multiple choice and 5 short answer questions through Pages 60 - 80.
Multiple Choice Questions
1. It is then cut into shape using a tool called ________ iron.
(a) A grizing.
(b) A gruzing.
(c) A grazing.
(d) A grozing.
2. The foundation for the apse and choir is completed after about how many months of work?
(a) Six.
(b) Four.
(c) Five.
(d) Ten
3. The moldings and capitals are also finished and stone slabs are laid on the floor in what pattern?
(a) Twill.
(b) Maze-like.
(c) Herringbone.
(d) Star.
4. The buttresses must be built upon temporary wooden frames called ____________.
(a) Stilts.
(b) Hurdles.
(c) Centerings.
(d) Framers.
5. Workmen reach the scaffolding by using ______________ built into the walls of the cathedral.
(a) An elevator.
(b) The stone circular staircases.
(c) The wooden circular staircases.
(d) Stilts.
Short Answer Questions
1. Most importantly, the stone cutters work inside ___________.
2. By 1330 what is finally completed?
3. What do the people do during this time to raise money?
4. What kind of tools do the stone cutter's workshop and the carpenter's workshop require?
5. Is Chutreaux, France a real place?
This section contains 230 words (approx. 1 page at 300 words per page) |