10 |18,000|1.58|0.36|1.68|0.38|0.370||18,000 |1.62|0.34|1.69|0.39|0.365 11 |20,000|1.61|0.39|1.72|0.42|0.405||20,000 |1.66|0.38|1.74|0.44|0.410 12 |22,000|1.66|0.44|1.76|0.46|0.450||22,000 |1.71|0.43|1.80|0.50|0.465 13 |24,000|1.81|0.59|1.81|0.51|0.550||24,000 |1.77|0.49|1.84|0.54|0.515 14 |26,000|1.86|0.64|1.86|0.56|0.600||26,000 |1.83|0.55|1.90|0.60|0.575 15 |28,000|1.91|0.69|1.91|0.61|0.650||28,000 |1.90|0.62|1.97|0.67|0.645 16 |30,000|1.96|0.74|1.96|0.66|0.700||30,000 |1.97|0.69|2.02|0.72|0.705 17 |32,000|2.00|0.78|2.02|0.72|0.750||32,000 |2.12|0.84|2.10|0.80|0.820 18 |34,000|2.04|0.82|2.11|0.81|0.815||34,000 |2.20|0.92|2.16|0.86|0.885 19 |36,000|2.10|0.88|2.20|0.90|0.890||36,000 |2.29|1.01|2.24|0.94|0.975 20 |38,000|2.16|0.94|2.25|0.95|0.945||38,000 |2.39|1.11|2.32|1.02|1.065 21 |40,000|2.28|1.06|2.38|1.08|1.070|| 22 |42,000|2.38|1.16|2.42|1.12|1.140|| 23 |44,000|2.44|1.22|2.52|1.22|1.220|| 24 |46,000|2.53|1.31|2.60|1.30|1.305|| 25 |48,000|2.66|1.44|2.71|1.41|1.425|| 26 |50,000|2.78|1.56|2.87|1.57|1.565|| || 33,000 lb., First Crack; ||24,000 lb., First Crack; 51,330 lb., Failed. ||44,000 lb., Failed. || At Elastic Limit:  Load, 22,000 lb.; ||At Elastic Limit:  Load, 20,000 lb.; deflection, 0.45 in.; || deflection, 0.41 in.; S, 3,484 lb. || S, 3,018 lb. || Maximum:  Load, 51,330 lb.; ||Maximum:  Load, 44,000 lb.; deflection,.....; || deflection,.....; S, 8,925 lb. || S, 6,627 lb. || E = 1,695,000 lb. || E = 1,625,000 lb. ============================================================
=============

TABLE 4.—­(Continued.)—­LOAD AND DEFLECTION LOG.  BEAM VII.

Columns in table: 

A:  Load, in pounds. 
B:  Reading. 
C:  Total deflection. 
D:  Mean total deflection.

Date:  March 2d, 1909.                     Date:  February 20th, 1909.
l = 12 ft.;                            l = 12 ft.;
b (mean) = 6.56 in.;                   b (mean) = 6.22 in.;
h (mean) = 15.62 in.;                  h (mean) = 15.62 in.;
c = 7.81 in.                           c = 7.81 in. 
Time = 1 hr.                              Time = 33 min.
=======================================================
================== | P | DEFLECTION, IN INCHES. || P | DEFLECTION, IN INCHES.  No.+------+----+----+----+----+-----++---------+----+----+--
--+----+----- | A | B | C | B | C | D || A | B | C | B | C | D ---+------+----+----+----+----+-----++---------+----+----+--
--+----+----- 1 | 0 |1.84| 0 |1.71| 0 | 0 || 0 |1.69| 0 |1.73| 0 | 0 2 | 2,000|1.88|0.04|1.74|0.03|0.035|| 2,000 |1.72|0.03|1.77|0.04|0.035 3 | 4,000|1.92|0.08|1.79|0.08|0.080|| 4,000 |1.76|0.07|1.80|0.07|0.070 4 | 6,000|1.96|0.12|1.81|0.10|0.110|| 6,000 |1.80|0.11|1.84|0.11|0.110