20,873.70 9.99
Switches 6,331.85 3.03
Tools 2,749.50 1.31
Hand cars and sundries 5,691.39 2.72
----------- ------
Total $107,855.84 $51.36
Switches 6,331.85 3.03
Tools 2,749.50 1.31
Hand cars and sundries 5,691.39 2.72
----------- ------
Total $107,855.84 $51.36
Equipment.
Average
Number.
Total. Cost.
Locomotives 264 $53,480.98
$202.58 Cars (300 of these passenger—3.5%)
8,537 49,577.20 5.81
-----------
--------
Total cost $210,414.02
Total average cost per mile
$100.67
EAST TENNESSEE, VIRGINIA & GEORGIA SYSTEM.
_______________________________________________________
___________________ | | | | | | | Number | Cost of | Cost of | Total |Average| | Changed.| Labor. | Material | Cost. | Cost. | |_________|__________|__________|___________|_______| | | | | | | Engines and tenders. | 180 |$ 8,227.47|$ 2,904.30|$ 11,131.77|$ 61.82| Pass., bag., and mail | | | | | | cars. | 168 | 734.93| 59.67| 794.60| 4.73| Freight cars and | | | | | | cabooses. | 5,175 | 17,425.57| 1,224.08| 18,649.65| 3.60| M. of W. cars. | 439 | 2,038.44| 549.47| 2,587.91| 5.89| | Miles | | | | | | Track. | | | | | Track (inc. sidings). | 1,532.7 | 27,718.17| 40,912.09| 68,630.26| 44.78| Bridges. | 1,532.7 | 1,808.57| 200.00| 2,008.57| 1.31| Track tools. | 1,532.7 | 194.48| 2,573.83| 2,768.31| 1.80| Storage tracks, inc. | | | | | | taking up. | 37.02| 9,825.41| 1,481.59| 11,307.00| 305.44| Shop tools. | | 472.20| 2,728.30| 3,200.50| | |_________|__________|__________|___________|_______| | | | | | | Total cost. | |$68,445.24|$52.633.33|$121,078.57| | Total average cost | | | | | | per mile. | | | | |$ 79.06| ______________________|_________|__________|__________|_____
______|_______|
Axles condemned 577 Wheels condemned 754 Wheels burst 202 New axles used 1,102 New wheels used 2,783 Axles turned back 8,316