A Compilation of the Messages and Papers of the Presidents eBook

This eBook from the Gutenberg Project consists of approximately 856 pages of information about A Compilation of the Messages and Papers of the Presidents.

A Compilation of the Messages and Papers of the Presidents eBook

This eBook from the Gutenberg Project consists of approximately 856 pages of information about A Compilation of the Messages and Papers of the Presidents.

“The Board of Ordnance and Fortifications” provided for under the act approved September 22 last was convened October 30, 1888, and plans and specifications for procuring forgings for 8, 10, and 12 inch guns, under provisions of section 4, and also for procuring 12-inch breech-loading mortars, cast iron, hooped with steel, under the provisions of section 5 of the said act, were submitted to the Secretary of War for reference to the board, by the Ordnance Department, on the same date.

These plans and specifications having been promptly approved by the board and the Secretary of War, the necessary authority to publish advertisements inviting proposals in the newspapers throughout the country was granted by the Secretary on November 12, and on November 13 the advertisements were sent out to the different newspapers designated, The bids for the steel forgings are to be opened on December 20, 1888, and for the mortars on December 15, 1888.

A board of ordnance officers was convened at the Watervliet Arsenal on October 4, 1888, to prepare the necessary plans and specifications for the establishment of an army gun factory at that point.  The preliminary report of this board, with estimates for shop buildings and officers’ quarters, was approved by the Board of Ordnance and Fortifications November 6 and 8.  The specifications and form of advertisement and instructions to bidders have been prepared, and advertisements inviting proposals for the excavations for the shop building and for erecting the two sets of officers’ quarters have been published.  The detailed drawings and specifications for the gun-factory building are well in hand, and will be finished within three or four months, when bids will be invited for the erection of the building.  The list of machines, etc., is made out, and it is expected that the plans for the large lathes, etc., will be completed within about four months, and after approval by the Board of Ordnance and Fortifications bids for furnishing the same will be invited.  The machines and other fixtures will be completed as soon as the shop is in readiness to receive them, probably about July, 1890.

Under the provisions of the Army bill for the procurement of pneumatic dynamite guns, the necessary specifications are now being prepared, and advertisements for proposals will issue early in December.  The guns will probably be of 15 inches caliber and fire a projectile that will carry a charge each of about 500 pounds of explosive gelatine with full-caliber projectiles.  The guns will probably be delivered in from six to ten months from the date of the contract, so that all the guns of this class that can be procured under the provisions of the law will be purchased during the year 1889.

I earnestly request that the recommendations contained in the Secretary’s report, all of which are, in my opinion, calculated to increase the usefulness and discipline of the Army, may receive the consideration of the Congress.  Among these the proposal that there should be provided a plan for the examination of officers to test their fitness for promotion is of the utmost importance.  This reform has been before recommended in the reports of the Secretary, and its expediency is so fully demonstrated by the argument he presents in its favor that its adoption should no longer be neglected.

Copyrights
Project Gutenberg
A Compilation of the Messages and Papers of the Presidents from Project Gutenberg. Public domain.