The Secretary of the Navy now detailed Captain John Rodgers to accompany Mr. Eads to the West, and purchase and fit out such steamers as should be found necessary for the service. Up to this time the Secretary of War had manifested the most supreme indifference in regard to the whole subject, but he now claimed entire jurisdiction in the matter, and this interference caused considerable vexation and delay. At length he issued an order to Mr. Eads and Captain Rodgers to proceed with their purchases. These gentlemen obtained the approval of General McClellan, in whose department the purchases were to be made, and began their operations.
Upon arriving at Cairo, they found one of the old snag-boat fleet, called the “Benton.” Mr. Eads knew the boat well, as he had formerly owned her, and proposed to purchase and arm her, but Captain Rodgers did not approve the plan for converting her into a gunboat. Mr. Eads then proposed to purchase and arm several of the strong, swift boats used for the navigation of the Missouri River, and equip them at St. Louis, from which point there would always be water enough to get them below Cairo. Captain Rodgers disapproved this plan also, and went to Cincinnati, where he purchased and equipped the “Conestoga,” “Tyler,” and “Lexington,” and started them down the river. They were not iron-clad, but were merely protected around the boilers with coal bunkers, and provided with bullet-proof oaken bulwarks. Mr. Eads had warned Captain Rodgers that he could not depend upon the Ohio to get his boats down to Cairo, and his predictions were realized. The boats were started from Cincinnati some time in July; they were detained on the bars of the Ohio for six or seven weeks, and did not reach Cairo until about the first of September; then the bottom of the “Tyler” was found to be so badly damaged by sand-bars that she had to be put on the marine railway for repairs.
In July, 1861, the War Department advertised for proposals to construct a number of iron-clad gunboats for service on the Mississippi River. On the 5th of August, when the bids were opened, it was found that Mr. Eads proposed to build these boats in a shorter time and upon more favorable terms than any one else. His offer was accepted, and on the 7th of August he signed a contract with Quartermaster-General Meigs to have ready for their crews and armaments, in sixty-five days, seven vessels, of about six hundred tons each, each to draw six feet of water, to carry thirteen heavy guns, to be plated with iron two and a half inches thick, and to steam nine miles per hour. “They were one hundred and seventy-five feet long, and fifty-one and a half feet wide; the hulls of wood; their sides placed out from the bottom of the boat to the water line at an angle of about thirty-five degrees, and from the water line the sides fell back at about the same angle, to form a slanting casemate, the gun-deck being but a foot above water. This