OPERATION—­WHEELBARROW EXCAVATION.  Date, March 10, 189__

KEY: 
A:  Op. 
B:  Time
C:  Av. 
D:  No.  Shov. 
E:  Total time min. 
F:  Total picking min. 
G:  Total shoveling and wheeling min. 
H:  Times per barrow min. 
I:  No obs
J:  Times per barrow min. 
K:  Time per pc. per shovel min. 
L:  No. shovels per barrow min. 
M:  Time wheeling 100 ft. min.

|A| B  | C  | D |A|  B  |  C  | D |A |  B |C | D |A |B |C
--------------------+-+----+----+---+-+-----+-----+---+--+--
--+--+---+--+--+- Department-- | | | | | | | | | | | | | | | Construction |a|1.37|1.37|15 |a|1.12 |1.12 |12 |a’|1.86| |11 | | | Men--Mike Flaherty |b|1.56|0.19| |b|1.39 |0.27 | |a’|1.81| |13 | | | |c|1.82|0.26| |c|1.58 |0.19 | |a’|2.14| |16 | | | Materials--Sand | | | | | | | | | | | | | | | requiring no pick |d|1.97|0.15| |d|1.70 |0.12 | |a’|1.98| |14 | | | Materials--Hard | | | | | | | | | | | | | | | clay in bank |e|1.97|0.15| |e|1.92 |0.22 | | | | | | | | Implements--No. 3 | | | | | | | | | | | | | | | shovel; | | | | | | | | | | | | | | | Contractors’ | | | | | | | | | | | | | | | wooden | | | | | | | | | | | | | | | wheelbarrow |f|2.36|0.09| |f|2.36 |0.09 | | | | | | | | Conditions--Day-work| | | | | | | | | | | | | | | for a contractor. | | | | | | | | | | | | | | | By previous | | | | | | | | | | | | | | | observation |a|1.24|1.24|13 |a|2.05 |0.13 |13 | | | | | | | An average barrow | | | | | | | | | | | | | | | load of sand is | | | | | | | | | | | | | | | 2.32 cu. ft. | | | | | | | | | | | | | | | measured in cut |b|1.36|0.12| |b|1.38 |0.15 | | | | | | | | An average barrow | | | | | | | | | | | | | | | load of clay is | | | | | | | | | | | | | | | 2.15 cu. ft. | | | | | | | | | | | | | | | measured in cut |c|1.59|0.23| |c|1.60 |0.22 | | | | | | | | |d|1.83|0.24| |d|1.78 |0.18 | | | | | | | | |e|2.08|0.25| |e|2.05 |0.27 | | | | | | | | |f|2.23|0.25| |f|2.23 |0.18 | | | | | | | | ------------------------------------------------------------
----------------- Time | Complete | | | | | Detail | | | | | | Operations | E | F | G | H | Operations |I | J | K | L | M ------+-------------+---+---+---+----+-------------+--+-----
+-----+----+----- 7 A.M.|Commenced | | | | | | | | | |