Bell's Cathedrals: Chichester (1901) eBook

This eBook from the Gutenberg Project consists of approximately 125 pages of information about Bell's Cathedrals.

Bell's Cathedrals: Chichester (1901) eBook

This eBook from the Gutenberg Project consists of approximately 125 pages of information about Bell's Cathedrals.

The first fire had excited some public interest in the great enterprise at Chichester, and from this an impetus was derived which helped towards its execution, after the small damage caused by the fire had been quickly repaired, for by about the year 1150 the four western bays of the nave, with its aisles, must have been complete.  It should be understood that the fire in 1114 did not lead to any change in the character of the church such as was occasioned by that other fire which shall be considered presently; but the work had quietly continued, so that the aisles of the nave were vaulted by about 1170-1180, the lady-chapel was completed, and in 1184 all was ready for the second ceremony of consecration which then took place.  It has been assumed that this act implies that the whole of the original scheme had been executed.  Nevertheless, it must be acknowledged that again there are but few authentic records to show in what manner the work had been carried on, nor are there many indications of the way in which the necessary materials and money were provided to help it forward.  But it is interesting to notice that in 1147 William, Earl of Arundel, gave to the see that quarter of the city in which stood the palace of the bishops, the residences of the canons, and the cathedral church.  This grant of land confirmed the see in its possession of all that part of the city now within the bounds of the close.

[Illustration:  The west front, about 1836. from Winkles’s Cathedrals.]

What, then, was the plan of that church which was designed to suit the requirements set down by Bishop Ralph Luffa?  The ground-plan at the end of the volume shows the building as it now remains, after many alterations have been made in the original scheme; but the arrangement is still, in its main features, much the same as was at first devised.  The usual plan was adopted, and this was the provision of a nave and chancel having a transept between them so as to make the form of a cross.  The nave had aisles along its whole length.  These were extended on both sides eastward of the transept, and continued as an ambulatory round a semicircular apse.  The transept also had a small apsidal chapel on the east side of both its north and south arms.  At the point of intersection between the transept and the nave the supports of the central tower rose.  Between this and the west end there were eight arches in each of the arcades opening north and south from the nave into the aisles.  Beyond the crossing towards the east there were three similar arches in the arcades which connected the apse with the large piers of the central tower.  These three bays, together with the apse, enclosed the chancel; and this comprised the sanctuary, which was that part within the apse itself, and also the presbytery, or choir of the priests, which occupied the remaining space between the apse and the arch into the transept beneath the tower.  At a later date the accommodation

Copyrights
Project Gutenberg
Bell's Cathedrals: Chichester (1901) from Project Gutenberg. Public domain.