Scientific American Supplement, No. 514, November 7, 1885 eBook

This eBook from the Gutenberg Project consists of approximately 116 pages of information about Scientific American Supplement, No. 514, November 7, 1885.

Scientific American Supplement, No. 514, November 7, 1885 eBook

This eBook from the Gutenberg Project consists of approximately 116 pages of information about Scientific American Supplement, No. 514, November 7, 1885.
with linings having a thin face of India-rubber or other suitable material, by the use of which slabs with their edges as shown, and also of the greatest accuracy, can be manufactured.  That portion of the back of the slab which is undercut is formed by means of soft India-rubber cores.  The moulds for making portions of the slabs have a contrivance by which their length may be adjusted to suit given dimensions.

During the process of casting the slabs, and while they are in a plastic state, mouldings (if required) or other ornaments, having a suitable key, are inserted in the plastic surface, which is finished off to them (Figs. 7, 8, and 10).  The slabs may also be cast with ornaments, etc., complete at one operation (Fig. 11), but it is more economical to have separate moulds for the mouldings and other ornaments, and separate moulds for the slabs, and to apply the mouldings, etc., during the process of casting the slab.  Corbels (Fig. 9), sets off (which would be somewhat similar to the plinth course slab No. 10), and other constructive features may also be applied in a similar way, or may be provided for during the casting of the slab.  A thin facing of marble or other ornamental solid or even plastic material may be applied to the face of the slabs during the process of casting, thus enabling the work to be finished as it is carried up, or a key may be formed on the face of the slab to enable the structure to be plastered afterward.

[Illustration:  Fig. 19.  Fig 20.]

In Fig. 20, the structure from the bottom of the trenches is shown with the sides of the trenches removed.  It will be seen that the footings are constructed in the most economical manner by not being stepped.  As no damp-course is required in concrete work, when the aggregate is of a non-porous material, one is not shown.  Upon the top of the footings is generally laid a horizontal slab, called the wall-base slab, the special feature of which is that it enables the thickness of the wall to be gauged accurately, and also provides a fixing for the first course of slabs.  Figs. 4 and 5 show such slabs for internal and external angles, and Fig. 6 shows one for straight work.  The use of a wall-base slab is not essential, although it is the more accurate method of building, for in cases where it is desirable to economize labor, or from other causes, the slabs forming the first course may be made with a thicker base, and may be fixed by a deposition of concrete, which is allowed to set behind them.  The second course of slabs is laid upon the first course with breaking joints of half-slab bond, each course being keyed to the other by means of a quick-setting cementing material poured into the key-holes provided in the edges of the slab for that purpose, a bituminous cement being preferred.  The key-holes are made in several ways, those shown in the illustrations being of a dovetail shape; circular, square, or indeed holes of any other shape formed

Copyrights
Project Gutenberg
Scientific American Supplement, No. 514, November 7, 1885 from Project Gutenberg. Public domain.