A Compilation of the Messages and Papers of the Presidents eBook

This eBook from the Gutenberg Project consists of approximately 403 pages of information about A Compilation of the Messages and Papers of the Presidents.

A Compilation of the Messages and Papers of the Presidents eBook

This eBook from the Gutenberg Project consists of approximately 403 pages of information about A Compilation of the Messages and Papers of the Presidents.
accomplished by previous appropriations, but without my knowledge, when the bill was presented to me.  Captain Whipple, of the Topographical Engineers, to whom the expenditure of the last appropriation of $45,000 for this purpose in 1856 was intrusted, in his annual report of the 1st October, 1858, stated that the dredging was discontinued on the 26th August, 1858, when a channel had been cut averaging 275 feet wide, with a depth varying from 12 to 15-1/2 feet.  He says: 

So long as the lake retains its present height we may assume that the depth in the channel will be at least 13-1/2 feet.

With this result, highly creditable to Captain Whipple, he observes that if he has been correctly informed “all the lake navigators are gratified.”  Besides, afterwards, and during the autumn of 1858, the Canadian Government expended $20,000 in deepening and widening the inner end of the channel excavated by the United States.  No complaint had been made previous to the passage of the bill of obstructions to the commerce and navigation across the St. Clair flats.  What, then, was the object of the appropriation proposed by the bill?

It appears that the surface of the water in Lake St. Clair has been gradually rising, until in 1858 it had attained an elevation of 4 feet above what had been its level in 1841.  It is inferred, whether correctly or not it is not for me to say, that the surface of the water may gradually sink to the level of 1841, and in that event the water, which was, when the bill passed, 13-1/2 feet deep in the channel, might sink to 9-1/2 feet, and thus obstruct the passage.

To provide for this contingency, Captain Whipple suggested “the propriety of placing the subject before Congress, with an estimate for excavating a cut through the center of the new channel 150 feet in width and 4-1/2 feet deep, so as to obtain from the river to the lake a depth of 18 feet during seasons of extreme high water and 12 feet at periods of extreme low water.”  It was not alleged that any present necessity existed for this narrower cut in the bottom of the present channel, but it is inferred that for the reason stated it may hereafter become necessary.  Captain Whipple’s estimate amounted to $50,000, but Congress by the bill have granted $55,000.  Now, if no other objection existed against this measure, it would not seem necessary that the appropriation should have been made for the purpose indicated.  The channel was sufficiently deep for all practical purposes; but from natural causes constantly operating in the lake, which I need not explain, this channel is peculiarly liable to fill up.  What is really required is that it should at intervals be dredged out, so as to preserve its present depth; and surely the comparatively trifling expense necessary for this purpose ought not to be borne by the United States.  After an improvement has been once constructed by appropriations from the Treasury it is not too much to expect that it should be kept in repair by that portion of the commercial and navigating interests which enjoys its peculiar benefits.

Copyrights
Project Gutenberg
A Compilation of the Messages and Papers of the Presidents from Project Gutenberg. Public domain.